Plumbing · Hounslow, London
Bathroom Installation in Hounslow & Southall
A full bathroom or wet-room installation in Hounslow or Southall is as much about what's behind the tiles as what's on top of them — the supply pipework, the waste routing, the electrics around a shower. We've fitted bathrooms across the area since 2008, from Victorian terraces with original pipework still in the walls to brand-new flats where every run is being installed from scratch.
Southall's contrast is the clearest example in the whole service area: dense Victorian terraces built out along the Great Western Railway, many original bathrooms decades old and overdue a full strip-out, sitting a few streets from the Green Quarter — 8,103 new homes rising on the old Southall gasworks site, where every bathroom is a first-fix installation into a shell with no legacy pipework to work around at all. Both need the same care, applied differently.
Every installation is carried out to Building Regulations Part G, which governs sanitation, hot water safety and water efficiency, and Part P for any associated electrical work near water — plus WRAS-approved fittings throughout, meaning every tap, valve and fitting used has passed the Water Regulations Advisory Scheme's approval for use on the UK mains supply. Thames Water's hard supply also factors into every spec — a shower valve or tap chosen without accounting for scale build-up ages faster here than it should.
Whether it's a straightforward like-for-like refit or a full wet-room conversion with a walk-in shower and no step, the price and scope are agreed before a single fitting is removed. Call 07863 767134 for a quote.
What We Do
Our Bathroom & Wet-Room Installation Services
From a like-for-like refit to a full wet-room, every installation starts with the pipework and waste routing, not the tile choice.

Full Bathroom Installation
A complete installation covers everything from first-fix pipework and waste routing through to the final fitting of bath, toilet, basin and shower — whether that's a straightforward refit of an existing layout or a full reconfiguration into a new one. In Southall's Victorian terraces, that usually means assessing what original pipework can stay and what's overdue replacement first.
In Green Quarter flats and other new-build properties, first-fix work is a cleaner job with no legacy pipework to route around, but the same Part G and WRAS-approved fitting standards apply regardless of how new the shell is.

Wet-Room Conversion
A wet-room replaces a stepped shower enclosure with a level, fully tanked and waterproofed floor that drains directly, which needs correct falls built into the subfloor and a tanking system that's genuinely watertight before a single tile goes down. Getting the fall and drainage wrong is the single most common cause of a wet-room that leaks months later.
This is a popular option in older Hounslow and Isleworth properties looking to modernise a small or awkward bathroom without extending the footprint.

Fixture & Fitting Replacement
Not every job needs a full strip-out — replacing a bath, basin, toilet or shower valve on its own is often enough where the underlying pipework and waste are sound. This is common in properties where the room itself works fine but individual fittings have simply reached the end of their working life, particularly shower valves and taps worn early by Thames Water's hard supply.
We'll tell you honestly whether a partial replacement makes sense or whether the surrounding pipework's age means a fuller installation is the better long-term call.
The Benefits
Why the Standards Matter as Much as the Tiling
A bathroom that looks finished on day one and a bathroom that's still sound in ten years come down to what's behind the surfaces, not what's visible on it.
Built to Part G and Part P, Not Just to Look Right
Building Regulations Part G covers sanitation, hot water safety and water efficiency, while Part P covers electrical safety for anything installed near water — both apply to a bathroom installation regardless of how straightforward the job looks. Meeting them properly, not just meeting the appearance of a finished room, is what determines whether the installation holds up.
WRAS-Approved Fittings Throughout
Every tap, valve, and fitting used has passed the Water Regulations Advisory Scheme's approval process for use on the UK mains supply — the standard that governs which fittings are suitable to connect to it at all. It's specified as standard on every installation, not upgraded to only when asked.
Written Pricing Before Any Work Starts
A full bathroom installation across Hounslow and Southall typically runs £3,000–£8,000 or more depending on scope, fittings specified and whether pipework needs rerouting. That range is confirmed as a specific written quote once the scope is agreed, not offered as a vague estimate that changes once the job's underway.
Why Us
Why Hounslow & Southall Choose Us to Fit Their Bathroom
Eighteen years of installations across the area's full range of housing, from Victorian terraces to brand-new Green Quarter flats, since Tom and Jack started the firm in 2008.
We Work Across the Full Range, Old to New
Southall alone runs from Victorian terraces with original pipework to the Green Quarter's first-fix new-build flats — two completely different starting points that both need the same standard of finish. Knowing which approach a property needs before quoting is part of getting the price right the first time.
Specified for Hard Water From the Start
A shower valve or tap chosen without accounting for Thames Water's hard supply scales up and fails faster than it should. We factor that into every fitting spec, not as an upsell but because it's the difference between fittings that last and ones that need replacing again within a couple of years.
Coordinated With the Rest of Your Plumbing
A bathroom installation often surfaces issues elsewhere — ageing supply pipework that needs leak detection before it's built over, or a cylinder that needs attention before it's asked to serve a new shower — see boiler & hot water repair. See our full services for how everything connects.
For everything beyond bathroom work — boiler & hot water repair, leak detection, blocked drains and emergency plumbing — see our services. Bathroom installation covers Southall and Isleworth on the same terms as the rest of the area.
Frequently Asked Questions
How much does a full bathroom installation cost in Hounslow and Southall?
Typically £3,000 to £8,000 or more, depending on the scope of work, the fittings specified, and whether existing pipework needs rerouting or replacing as part of the job. A straightforward like-for-like refit with sound existing pipework sits toward the lower end; a full reconfiguration or wet-room conversion with new pipe runs sits higher. A specific written quote is agreed once the scope is confirmed, not offered as a rough estimate that shifts once work is underway.
What's the difference between a wet-room and a standard bathroom with a shower enclosure?
A wet-room has a level, fully tanked and waterproofed floor with a shower area that drains directly into the floor rather than being contained by a stepped tray or enclosure. It needs precisely built falls in the subfloor so water actually runs to the drain, and a tanking membrane that's genuinely watertight underneath the visible tiling. A standard enclosure is generally simpler to install and cheaper, since it doesn't need the same subfloor and tanking work, but a wet-room suits an awkward or small bathroom, or a step-free design, better.
What are Building Regulations Part G and Part P, and why do they matter for a bathroom?
Part G covers sanitation, hot water safety and water efficiency in a dwelling, setting standards for how sanitary facilities and hot water systems are installed. Part P covers electrical safety, and applies to a bathroom because of the strict rules around electrical work near water — lighting, shaver sockets, extractor fans and any other electrics in a room that's inherently wet. Every installation is carried out to both standards, which shapes decisions like fitting placement and cable routing that aren't always visible in the finished room.
What does 'WRAS-approved' mean, and does it matter which fittings I choose?
WRAS stands for the Water Regulations Advisory Scheme, and its approval process tests taps, valves and fittings for suitability to connect to the UK mains water supply without risking contamination or backflow into the wider system. Using WRAS-approved fittings throughout is standard on every installation we do, and it's worth checking for on any fitting you're sourcing yourself, since not everything sold as a bathroom fitting meets that standard. A fitting that hasn't been through that approval process can also fail faster under Thames Water's hard supply, so the check isn't just a paperwork formality — it affects how long the fitting actually lasts.
Should I replace my whole bathroom or just the fittings that have failed?
It depends on the condition of what's underneath — if the pipework and waste routing are sound and only a bath, basin, toilet or shower valve has reached the end of its working life, a partial replacement is often the sensible option. If the pipework itself is original, ageing, or already showing signs of wear from decades of Thames Water's hard supply, a fuller installation usually makes more long-term sense than repeatedly patching around it. We'll give you an honest read on which situation applies to your specific bathroom.
Why does Thames Water's hard water matter for choosing bathroom fittings?
Hard water accelerates limescale build-up inside shower valves, tap cartridges and shower heads, which is why fittings chosen without that in mind tend to stiffen, drip or fail years earlier than their expected lifespan. We factor Thames Water's regional hard-water classification into every fitting spec across Hounslow, Southall, Isleworth and Heston, since it's a constant across the whole service area regardless of which street the property's on. Thames Water's own classification puts 'hard' at 200–300 mg/l calcium carbonate and 'very hard' above that, and its supply across this whole region falls into that range, which is why we spec accordingly rather than treating it as an occasional local quirk.
How long does a full bathroom installation take?
A straightforward refit of an existing layout, where pipework doesn't need significant rerouting, typically takes several days to just over a week. A full reconfiguration or wet-room conversion involving new pipe runs, tanking and a longer drying and curing period for the waterproofing takes longer, often into a second or third week. We give a specific timeline once the scope's agreed, since access, the extent of any rerouting, and drying times for tanking all affect it.
Is the Green Quarter's new-build plumbing different to work with than an older Southall terrace?
Yes, in a genuinely useful way — Green Quarter flats have no legacy pipework to route around, so first-fix work goes into a clean shell rather than working around decades-old runs, which usually makes the process faster and more predictable. Older Southall terraces need an honest assessment of what existing pipework can be reused and what should be replaced as part of the job, since building on top of failing original pipework just relocates the problem behind new tiles. The Green Quarter itself sits on the 88-acre former Southall Gas Works site, cleared through open-air soil remediation completed in 2019, so its plumbing runs are all pressurised or manifold systems designed to modern standards from day one rather than adapted from an older gravity-fed layout.
Can you install a bathroom in a flat, or only in houses?
Yes, we install in both, though flats sometimes carry extra considerations — shared waste stacks, noise and access rules that may apply in a block, or, for a leasehold property, permissions that need confirming with the freeholder or management company before work starts. Southall's older terraces and the Green Quarter's new-build flats both feature heavily in the bathroom work we do across the area, and each gets the same standard of installation regardless of the building type. In a Green Quarter flat that usually means coordinating access and any managing-agent sign-off in advance, since the building itself, not just the individual flat, sets the rules for when work can happen.
Do you handle the electrics for a new shower, or is that a separate job?
Electrical work around a bathroom — shower power, lighting, extractor fans — falls under Part P of the Building Regulations because of the specific risks of electrics near water, and it's coordinated as part of the overall installation rather than left as a separate booking you have to arrange yourself. It's specified and carried out to that standard as a normal part of the job, not treated as an afterthought once the plumbing's finished. That includes the right circuit protection for a shower's power supply and correctly rated extractor fans for a room with no natural ventilation, both agreed as part of the same written quote.
What happens if you find a problem with the existing pipework once work has started?
You'll hear about it immediately, with an honest explanation of what was found, what it means for the job, and a revised written quote before any extra work proceeds — nothing gets fixed or charged for without that conversation happening first. This comes up most often in older Southall and Hounslow terraces once original pipework behind a wall or under a floor is finally exposed during a strip-out. Work always pauses at that point rather than continuing on the assumption you'll accept the extra cost, so you get a real choice before anything further is opened up.
Plan Your Bathroom Installation
From a refit to a full wet-room conversion. Call 07863 767134 for a written quote.
Call 07863 767134
